Granville Harbour Wind Farm

The Granville Harbour Wind Farm is a 112 MW facility located near Zeehan, on the picturesque West Coast of Tasmania. The wind farm’s 31 turbines produce around 400,000 gigawatt hours of clean, renewable energy every year.

The Challenge

The Granville Harbour Wind Farm commenced construction in 2018 and reached commercial operations in 2020. Our client required a range of surveying services to support the construction phase and beyond.

Our solution

Our multi-disciplinary service offering for the project included aerial, volume, monitoring and property surveys. This included:

  • Ortho-rectified aerial photogrammetry (fixed wing and drone) for as-constructed information of the completed wind farm development plus high-resolution imagery for marketing material.
  • Monitoring of land slip and other sensitive exclusion zones during and post construction.
  • Volume surveys including the calculation of volumes of material used from on-site during the construction phase.
  • Preparation of a lease plan including all road accesses and hardstand areas associated with the turbines and infrastructure.

Outcomes

Our capacity to provide services to a remote region on Tasmania’s west coast ensured we were able to meet the client’s surveying requirements for the Granville Harbour Wind Farm.

 Previous Project

M6 Stage 1

Next Project 

Hobart Rivulet Digital Twin